Contracted by Hotel Epik – Oversight of the installation of an interactive video system in their bar.
Hardware: Managed, installed and configured three projectors and three infrared cameras in the ceiling, pointing straight down on a bar-top.
Video Production: Color Balancing the three projectors.
Software: Lots of configuration in proprietary software for seamlessness.
Overhead photo looking down
Color correcting the seam between projections